We went to six flags on Friday. James was off work and we took the four oldest boys. We stayed until after 10:00. It was a full, but fun day. Yesterday was the 4th and it rained, so the fireworks will be tonight. We'll probably stay home and watch them from here. None of us really care all that much about fireworks. The neighbors are shooting them off right now, and it is daytime, that seems a bit odd to me, you can't really see them.
I'm posting pictures of the house below, but they are from over a week ago. I wanted to take pictures yesterday, but it was too muddy to walk in front or around the house. We got quite a rain earlier yesterday. I hope to take some tomorrow.
This past week a lot got done. The roof is just about shingled; it should be done early this week.
The dormer window on the front was built. The garage, basement and front porch now have concrete pourred. All the window and doors on the main level are in, except the window in the loft. The stairs and walls down to the basement are done. The septic tank is in and the heating pipes are delivered. I don't expect this much to get done this week. The basement windows will probably get done and probably other things that won't be so noticable. The brick should start to get layed by the end of the week or beginning of next week. That will take about a month. The plumber comes on Wednesday to do plumbing on the first floor and install the tubs (two of them).
I'll try and post again soon. This week should be a light week.